Open Access
Issue |
Int. J. Simul. Multidisci. Des. Optim.
Volume 16, 2025
|
|
---|---|---|
Article Number | 8 | |
Number of page(s) | 8 | |
DOI | https://doi.org/10.1051/smdo/2025007 | |
Published online | 14 May 2025 |
- T. He, D. Li, S.W. Yoon, A Heuristic Algorithm to Balance Workloads of High-speed SMT Machines in a PCB Assembly Line, Procedia. Manuf. 11, 1790–1797 (2017) [CrossRef] [Google Scholar]
- Q. Pi et al., Finite Potential Game Heuristic Algorithm for Workload Allocation in Dual-Gantry Placement Machines, IEEE Trans. Industr. Inform. 21, 2064–2073 (2025) [CrossRef] [Google Scholar]
- M. Castellani, S. Otri, D. T. Pham, Printed circuit board assembly time minimisation using a novel Bees Algorithm, Comput. Ind. Eng. 133, 186–194 (2019) [CrossRef] [Google Scholar]
- H.-P. Hsu, S.-W. Yang, Optimisation of component sequencing and feeder assignment for a chip shooter machine using shuffled frog-leaping algorithm, IEEE Trans. Autom. Sci. Eng. 17, 56–71 (2019) [Google Scholar]
- J. Mumtaz, Z. Guan, L. Yue, L. Zhang, C. He, Hybrid spider monkey optimisation algorithm for multi-level planning and scheduling problems of assembly lines, Int. J. Prod. Res. 58, 6252–6267 (2020) [CrossRef] [Google Scholar]
- H.-P. Hsu, Printed circuit board assembly planning for multi-head gantry SMT machine using multi-swarm and discrete firefly algorithm, IEEE Access. 9, 1642–1654 (2020) [Google Scholar]
- Y. Chen, J. Zhong, J. Mumtaz, S. Zhou, L. Zhu, An improved spider monkey optimisation algorithm for multi-objective planning and scheduling problems of PCB assembly line, Exp. Syst. Appl. 229, 120600 (2023) [CrossRef] [Google Scholar]
- C.-J. Lin, C.-H. Lin, Using an improved differential evolution for scheduling optimisation of dual-gantry multi-head surface-mount placement machine, Mathematics. 9, 2016 (2021) [CrossRef] [Google Scholar]
- H.-P. Hsu, Solving the feeder assignment, component sequencing, and nozzle assignment problems for a multi-head gantry SMT machine using improved firefly algorithm and dynamic programming, Adv. Eng. Inform. 52, 101583 (2022) [CrossRef] [Google Scholar]
- G. Lu, X. Yu, H. Sun, Z. Li, J. Qiu, H. Gao, A scan-based hierarchical heuristic optimisation algorithm for PCB assembly process, IEEE Trans. Ind. Informat. 20, 3609–3618 (2024) [CrossRef] [Google Scholar]
- G.-Y. Zhu, X.-W. Ju, W.-B. Zhang, Multi-objective sequence optimisation of PCB component assembly with GA based on the discrete Fréchet distance, Int. J. Prod. Res. 56, 4017–4034 (2018) [CrossRef] [Google Scholar]
- Z.k. Li, H. Sun, X. Yu, W. Sun, Heuristic sequencing hopfield neural network for pick-and-place location routing in multi-functional placers, Neurocomputing. 472, 35–44 (2022) [CrossRef] [Google Scholar]
- Y. Huang, L. Zhao, P. Liu, Feeder Layout Optimisation and Feeding Sequence Optimisation in High Speed and High Precision Placement Machine, Journal of Physics: Conference Series, Hangzhou,China, 2020, vol. 1605, no. 1, p. 012030. [CrossRef] [Google Scholar]
- T. He, D. Li, S.W. Yoon, A multi-phase planning heuristic for a dual-delivery SMT placement machine optimisation, Robot. Comput. Integr. Manuf. 47, 85–94 (2017) [CrossRef] [Google Scholar]
- D. Li, T. He, S.W. Yoon, Clustering-based heuristic to optimise nozzle and feeder assignments for collect-and-place assembly, IEEE Trans. Autom. Sci. Eng. 16, 755–766 (2018) [Google Scholar]
- T. He, D. Li, S.W. Yoon, An adaptive clustering-based genetic algorithm for the dual-gantry pick-and-place machine optimisation, Adv. Eng. Inform. 37, 66–78 (2018) [CrossRef] [Google Scholar]
- J. Zhong, Y. Chen, J. J. E. P. Mumtaz, A Multi-Objective Scheduling Optimisation Method for PCB Assembly Lines Based on the Improved Spider Monkey Algorithm, Eng. Proc. 23, 15 (2022) [Google Scholar]
- Q. Liu, X. Li, L.J.J.O.I.M. Gao, Mathematical modeling and a hybrid evolutionary algorithm for process planning, J. Intell. Manuf. 32, 781–797 (2021) [CrossRef] [Google Scholar]
- H. Gao, Z. Li, X. Yu, J. J.I.T.O.C. Qiu, Hierarchical multiobjective heuristic for PCB assembly optimisation in a beam-head surface mounter, IEEE Trans. Cybern. 52, 6911–6924 (2021) [Google Scholar]
- H. Wu, K. Wang, L. Ni, Minimal criterion genetic algorithm for multi-head surface mounting machine scheduling, Mod. Manuf. Eng. 3, 14–20 (2020) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.