Result of extreme validity.
Very low input | Very high input |
---|---|
Decision Variables: – Number of crane = 1 unit – Number of truck = 1 unit Results: – Total number of unloading = 543 ship/year – Total average unloading time = 774.01 minutes/ship - Average truck’s utility = 100% |
Decision Variables: – Number of crane = 3 unit – Number of truck = 30 unit Results: – Total number of unloading = 1690 ship/year – Total average unloading time = 125.4 minutes/ship – Average truck's utility = 20.96% |